patrick (PRADEEP) chandna7322 Pavilion Dr, Houston, TX 77083 · 713-518-6055 Email pradeepchandna07@gmail.com An accomplished and successful commercial construction management professional having 25 years of experience in construction supervision, facility, safety & general management of commercial construction, oil & gas manufacturing & maintenance.MD Madison Construction LLC. January 2021 To June 2022. Addick Barker US Army Field Office project.Construction site operation planning & supervision. USACE EM 385 safety procedures during construction process. Development of activity hazard analysis, equipment safety and corrective action reports. Site supervision & subcontracts scheduling. Weekly site progress & safety meetings with contractors & client. RMS REPORTS & RFI SUBMISSION TO RESIDENT ENGINEER.April 2017 to Dec. 2020.Construction Superintendent. TDK Construction. Houston TX 77040Construction of 3 Fuel Max Gas stations with 12 Dispensers 30 K Gallons Unleaded/20K Super/Diesel Fuel Tanks & 12000 Sq Ft of convenience store building with 3 restaurants. Construction of 150 units storage steel structure from ground works to final completion involving installation & coordination with subcontractors of all civil, electrical, plumbing, HVAC, fire suppression, gas pumps & city inspections as per the plans & specifications.jul 2012 – jan 2017Facility Construction, Safety & Compliance Manager, Petronash Americas.Responsible for planning, scheduling, directing, and overseeing facility construction of 60,000 sq ft industrial building on timely basis. Installation of CNC plate cutting & beam coping machines for well head control panels & chemical injection skids. Supervised erecting of hydraulic presses at the Weatherford facility in Katy for production of blow out preventor rubber ingots.Supervised all commercial issues including preparation of monthly invoices variation claims, quotes, subcontractors, job costing, accounts payable & safety compliance. oct 2008 – sep 11Project Specialist, Heston Group, Federal Emergency Management AgencyDeveloped scope of work and cost estimates for hurricane damaged government facilities. Preparation of project work sheets incorporating accurate data & reimbursement of funds for city of Clear Lake wastewater treatment plant.Coordination with engineers, contractors & FEMA/TDHCA to achieve timely completion & installation of modular homes.Griffin Dewatering, Houston, TX. Manager Projects & Development Feb 06-Oct 07 Analysis of Geotech bore logs & soil conditions to determine suitable dewatering system consisting of WellPoint, or deep wells. Water & Sewer Line utilizing proper excavation methodology of trench boxing, sheet piling, jack & boring with various Counties.Projects completed are as follows:48” Gas Pipe laying at Sabine PassBP Office Building Basement Tunnel & Ground water Lift Stations.Picerne Military Housing, Fort Polk, LA, Renovation Jan06 – July 07$2.5 Million project Medium size renovations of 100 town homes Units Managed the on-site supervision of all renovation construction, including plan reviews, cost control, value engineering, contract reviews and production. Oversaw the day-to-day field operations, management of all on-site trade suppliers and renovation production personnel. Bartawi Contracting Company, Dubai, UAE Assistant Project Manager 1988-2005Total volume of projects: $19 Million- Dubai Al Ain 6 Lane Highway pavement & Building Construction. Managed & directed engineers, foreman & top construction crew in the planning, developing and construction of residential, high rise commercial, Paving, sewage, water distribution and industrial projects from their inception to completion on time. McInerny Bahrain.Site Engineer 1983-1987Total volume of projects: $ 5.5 MillionConstruction of Sea Water Reverse Osmosis Water Treatment Plant of 2by25 Cub MT Capacity 12” & 16” 10,000 LF pipeline, utilizing proper excavation methodology of trench boxing, sheet piling, jack & boring, construction of 66kv Sub Station, cable trays cabinet control panel access.Education1983, B.e. Civil engineeringBirla institute of technology and science, pilani, india EM 385 US Army Safety Certification.OSHA 30 HR safety training for general industry. University Of South FloridaSkillsConstruction Site Management & Execution Budgeting & Cost controlsMicrosoft office Safety ComplianceConstruction AdministrationSubcontracts Co-ordination & NegotiationsDiverse set of project list over the last 2 decades:Construction of Addick Barker US Army office building 6000 Sq ft. & maintenance building 3000 sq ft. Conc. Paving 30000 sq ft.Ground up Construction of 3 Fuel Max Gas stations with 12 Dispensers, 30 K Gallons Unleaded/20K Super/Diesel Fuel Tanks & 12000 Sq. Ft. of convenience store building with 3 restaurants in each gas station strip mall with drive in access.Construction of 150 units storage steel structure from ground works to final completion.Construction of 60,000 Sq Ft of fabrication/assembly plant metal buildings & 5000 sq ft Office building. at Petronash oil & gas facility, Sugarland TX. Installation of 50 mobile homes during hurricane Ike under FEMA in Southeast Texas.Well Point Dewatering for Sabine Pass 48” gas pipeline.Dewatering on Basement construction at BP energy corridor at I 10 & Eldridge Pkwy.Construction & Remodeling of 25 townhomes at Fort Polk, LA US army base.Construction Of 50 miles Dubai Alain Hwy concrete paving, 20 nos. camel under pass & 5 intersections.Construction of community school, office & commercial retail buildings Bahrain.Storm/Sewer drainage, detention pond & 16” Water pipeline.Construction of 25 Cu M/Ton RO plant & 66KV electrical stepdown sub stations.Zero accident or mishap in all above projects.